That’s why optimizing layout is key.
In batch production, nesting multiple parts tightly within the build volume can drastically reduce per-unit cost.
A large, solid piece may cost $300
That same volume, filled with 8 smaller parts? Maybe $50 each
Inefficient use of space leads to wasted budget
When we help clients with large or high-volume orders, we always optimize the build to stretch every dollar.
Most teams overlook this—but it adds up.